Blue Winds is now ready to be turned over. She is unbolted
from the strong and lifted.....
|
A rope is tied around her and she is eased over as the
gravity pulls the keel towards the ground....
|
She is over and ready to be set up and leveled...
|
The temporary framing is removed from the inside of the
hull and she is ready to be fiberglassed.
|
The foam is removed from the keel and floor section......
|
A series of 12 cabin sole supports are built that will
be fiberglassed into the bilge...
|
The sole supports are in place....
|
A plywood cabin sole is put in place...the white board
in the center is made up of laminated 2 x 4's set out
across four of the sole supports to spread the pressure
of the mast which sits on it....
|
This is the corner post for the cabin top....the plywood
on the bottom is the deck.
|
Ceiling beams were laminated spruce and mahogany.
|